Citation: | GUO Dai-pei. Design and analysis of bracing system for junction of basement floor No. 1 and No. 2 of a foundation pit[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 46-50. DOI: 10.11779/CJGE2014S1007 |
[1] |
DG/TJ08—61—2010 基坑工程技术规范[S]. 上海: 上海市城乡建设和交通委员会, 2010. (DG/TJ08—61—2010 Standard code for design of excavation engineering[S]. Shanghai: Shanghai Urban and Rural Construction and Transportation Committee, 2010. (in Chinese))
|
[2] |
刘国彬, 王卫东. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 2009. (LIU Guo-bin, WANG Wei-dong. Excavation engineering handbook[M]. Beijing: China Architecture & Building Press, 2009. (in Chinese))
|
[3] |
TRUTY A, ZIMMERMANN Th, PODLES K, et al. Z_Soil.2010 用户手册[M]. 洛桑: 瑞狮软件工程公司, 2010. (TRUTY A, ZIMMERMANN Th, PODLES K, et al. Z_Soil.2010 user manual[M]. Lausanne: Zace Services Ltd Software Engineering, 2010. (in Chinese))
|
[4] |
史佩栋. 桩基工程手册[M]. 北京: 人民交通出版社, 2008. (SHI Pei-dong. Pile foundation engineering manual[M]. Beijing: People's Communications Press, 2008. (in Chinese))
|
[5] |
JGJ 94—2008 建筑桩基技术规范[S]. 北京: 中国建筑工业出版社, 2008. (JGJ 94—2008 Technical code for building pile foundations[S]. Beijing: China Architecture & Building Press, 2008. (in Chinese))
|