• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
DONG Xin-ping. Failure mechanism of the full-ring for segmented tunnel lining[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(3): 417-426. DOI: 10.11779/CJGE201403003
Citation: DONG Xin-ping. Failure mechanism of the full-ring for segmented tunnel lining[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(3): 417-426. DOI: 10.11779/CJGE201403003

Failure mechanism of the full-ring for segmented tunnel lining

More Information
  • Received Date: August 05, 2013
  • Published Date: March 19, 2014
  • To study the failure mechanism of segmented tunnel lining in the ultimate limit state, 3-rings full-scale tests on a segmented tunnel are performed by applying ovalisation load, and the failure history is analyzed by means of the parameters of failure index of segments and segment joints. The results show that the load bearing state and failure possibility of the component of the tunnel can be traced effectively, and the failure history can be described and explained according to the two parameters. The prediction of the crack and crush of the test tunnel rings can be verified by the observed and measured data obtained from the prototype tests. The failure history of the segment tunnel lining is composed of the crack initiation of segment joints, crack initiation of segments, formation of plastic hinge in segments, yielding of segment joints, development of multiple plastic hinges in segments and loss of the load bearing capacity of the whole rings. The initiation location and development sequence of plastic hinge in segments are influenced and controlled by the critical cross-sections in rings of the segmented tunnel lining.
  • [1]
    何 川, 封 坤. 大型水下盾构隧道结构研究现状与展望[J]. 西南交通大学学报, 2011, 46(1): 1-11. (HE Chuan, FENG Kun. Review and prospect of structure research of underwater shield tunnel with large cross-section[J]. Journal of Southwest Jiaotong University, 2011, 46(1): 1-11.(in Chinese))
    [2]
    闫治国, 丁文其, 沈碧伟, 等. 输水盾构隧道管片接头力学与变形模型研究[J]. 岩土工程学报, 2011, 33(8): 1185-1191. (YAN Zhi-guo, DING Wen-qi, SHEN Bi-wei, et al. Structural model for radial joints of water-conveyance shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(8): 1185-1191. (in Chinese))
    [3]
    李晓军, 陈雪琴, 朱合华. 基于Spreadsheet法的盾构衬砌截面可靠度分析[J]. 岩土工程学报, 2013, 35(9): 1642-1649. (LI Xiao-jun, CHEN Xue-qin, ZHU He-hua. Reliability analysis of shield lining sections using Spreadsheet method[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(9): 1642-1649. (in Chinese))
    [4]
    王如路, 宋 博, 王 祺, 等. 双圆盾构隧道衬砌错缝拼装整环试验及结构分析[J]. 地下工程与隧道, 2001(1): 12-15. (WANG Ru-lu, SONG Bo, WANG Qi, et al. Lining experiment and structure analysis of bi-circular shield tunnel with staggered joint splice on segments[J]. Underground Engineering and Tunnels, 2001(1): 12-15. (in Chinese))
    [5]
    郭智杰, 鲁 亮, 刘祖华. 双圆盾构法隧道衬砌1∶1 结构试验加载方法研究[J]. 结构工程师, 2004(3): 64-71. (GUO Zhi-jie, LU Liang, LIU Zu-hua. Loading method of test for double-circular face shield tunnel lining[J]. Structural Engineers, 2004(3): 64-71. (in Chinese))
    [6]
    LU Liang, LU Xi-lin, FAN Pei-fang. Full-Ring experimental study of the lining structure of Shanghai Changjiang Tunnel[J]. Journal of Civil Engineering and Architecture, 2011, 5(8): 732-739.
    [7]
    王 彪, 刘祖华, 鲁 亮. 上海崇明越江隧道衬砌整环试验加载方法研究[J]. 施工技术, 2006, 35(增刊): 52-54. (WANG Biao, LIU Zu-hua, LU Liang. A loading method of the test for lining whole wreath of Shanghai Chongming tunnel[J]. Construction Technology, 2006, 35(S0): 52-54. (in Chinese))
    [8]
    封 坤, 何 川, 夏松林. 大断面盾构隧道结构横向刚度有效率的原型试验研究[J].岩土工程学报, 2011, 33(11): 1750-1758. (FENG Kun, HE Chuan, XIA Song-lin. Prototype tests on effective bending rigidity ratios of segmental lining structure for shield tunnel with large cross-section[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(11): 1750-1758. (in Chinese)).
    [9]
    封 坤, 何 川, 苏宗贤. 南京长江隧道原型管片结构破坏试验研究[J]. 西南交通大学学报, 2011, 46(4): 564-571. (FENG Kun, HE Chuan, SU Zong-xian. Prototype test on failure characteristics of segmental lining structure for Nanjing Yangtze River Tunnel[J]. Journal of Southwest Jiaotong University, 2011, 46(4): 564-571. (in Chinese))
    [10]
    彭益成, 丁文其, 朱合华, 等. 盾构隧道衬砌结构的壳-接头模型研究[J]. 岩土工程学报, 2013, 35(10): 1823-1829. (PENG Yi-cheng, DING Wen-qi, ZHU He-hua, et al. Shell-joint model for lining structures of shield-driven tunnels[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(10): 1823-1829. (in Chinese)).
    [11]
    苏宗贤. 超大断面水下盾构隧道原型结构试验及结构分析模型研究[D]. 成都: 西南交通大学, 2008. (SU Zong-xian. Research on prototype test and structure analyse model of underwater shield tunnel with super-large cross-section[D]. Chengdu: Southwest Jiaotong University, 2008. (in Chinese))
    [12]
    鲁 亮, 孙越峰, 柳 献, 等. 地铁盾构隧道足尺整环结构极限承载能力试验研究[J]. 结构工程师, 2012, 28(6): 134-139. (LU Liang, SUN Yue-feng, LIU Xian, et al. Full-ring experimental study on the ultimate bearing capacity of the lining structure of the metro shield tunnel[J]. Structural Engineers, 2012, 28(6): 134-139. (in Chinese))
    [13]
    SCHREYER J, WINSELMANN D. Suitability tests for the lining for the 4th elbe tunnel tube - Results of large-scale Tests[J]. Tunnel, 2000, 1: 34-44.
    [14]
    BLOM C B M, HORST E J, JOVANOVIC P S. Three-dimensional structural analyses of the shield-driven “green heart” tunnel of the high-speed line south[J]. Tunnelling and Underground Space Technology, 1999, 14: 217-224.
    [15]
    CLIMENT Molins, ORIOL Arnau. Experimental and analytical study of the structural response of segmental tunnel linings based on an in situ loading test—Part 1: Test configuration and execution[J]. Tunnelling and Underground Space Technology, 2011, 26: 764-777.
    [16]
    ORIOL Arnau, CLIMENT Molins. Experimental and analytical study of the structural response of segmental tunnel linings based on an in situ loading test—Part 2: Numerical simulation[J]. Tunnelling and Underground Space Technology, 2011, 26: 778-788.
    [17]
    董新平. 盾构管片接头接触面缺陷模型分析[J]. 岩土工程学报, 2013, 35(7): 1369-1374. (DONG Xin-ping. The contact surface flaw model for the segment joint of segmented tunnel lining[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(7): 1369-1374. (in Chinese))
    [18]
    GONZALEZ C, SAGASETA C. Patterns of soil deformations around tunnels—Application to the extension of Madrid Metro[J]. Computers and Geotechnics, 2001, 28: 445-468.
    [19]
    董新平, 解枫赞. 一类盾构管片接头破坏历程的解析解[J].岩土工程学报, 2013, 35(10): 1870-1875. (DONG Xin-ping, XIE Feng-zan. Analytical solution of segment joint model for segmented tunnel lining[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(10): 1870-1875. (in Chinese))

Catalog

    Article views (547) PDF downloads (534) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return