Citation: | ZENG Zeng, ZHAO Shu-xiang, Ge Long-jin, PAN Wei-ping, LI Min, YIN Guo-feng. Failure mechanism of deformation and evaluation of treatment effect of high slope at right bank of Luozha RiverⅡHydropower Station[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S1): 171-175. DOI: 10.11779/CJGE2021S1031 |
[1] |
王浩, 王晓东, 泮俊. 超高路堑边坡治理工程案例研究Ⅰ:边坡失稳机制模拟分析[J]. 岩石力学与工程学报, 2017, 36(4): 899-909. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201704014.htm
WANG Hao WANG Xiao-dong PAN Jun. A case study of super-high cut slopeⅠ: simulation and analysis of instability mechanism of slopes[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(4): 899-909. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201704014.htm
|
[2] |
王浩, 王晓东, 泮俊. 超高路堑边坡治理工程案例研究Ⅱ:治理对策及其过程控制[J]. 岩石力学与工程学报, 2017, 36(5): 1152-1161. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201705011.htm
WANG Hao, WANG Xiaodong, PAN Jun. A case study of super-high cut slopeⅡ: stabilization measures and their process controls[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(5): 1152-1161. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX201705011.htm
|
[3] |
薛海斌, 张聪敏, 党发宁, 等. 考虑参数时空演化规律的黄土边坡极限平衡分析法研究[J]. 岩土工程学报, 2018, 40(增刊2): 162-166. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2018S2035.htm
XUE Hai-bin, ZHANG Cong-min, DANG Fa-ning, et al. Limit equilibrium analysis method for loess slopes considering spatial-temporal evolution laws of parameters[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(S2): 162-166. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2018S2035.htm
|
[4] |
郑颖人, 赵尚毅. 有限元强度折减法在土坡与岩坡中的应用[J]. 岩石力学与工程学报, 2004, 23(19): 3381-3388. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX200419037.htm
ZHENG Ying-ren, ZHAO Shang-yi. Application of strength reduction fem in soil and rock slope[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(19): 3381-3388. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX200419037.htm
|
[5] |
孙云春, 谭志伟, 董泽荣, 等. 临沧市罗闸河二级水电站安全监测系统工程工程竣工验收报告[R]. 昆明: 中国电建集团昆明勘测设计研究院有限公司, 2017.
SUN Yun-chun, TAN Zhi-wei, DONG Ze-rong, etal. Completion Acceptance Report of Safety Monitoring System Project of Luozha River II Hydropower Station in Lincang City[R]. Kunming: PowerChinaKunmingSurvey, Designand Research Institute Co, Ltd, 2017. (in Chinese)
|