[1] |
GB 5007 — 2002 建筑地基基础设计规范 [S]. 2002. (GB 5007 — 2002 Building foundation design code [S] . 2002. (in Chinese))
|
[2] |
YANG Xiao-li, YIN Jian-hua. Slope stability analysis with non-linear failure criterion[J]. Journal of Engineering Mechanics, 2004, 130 : 267 – 273.
|
[3] |
AUSILIO E, CONTE E, DENTE G . Stability analysis of slopes reinforced with piles[J]. Computers and Geotechnics, 2001, 28 : 591 – 611.
|
[4] |
YU H S, SALGADO R, SLOAN S W, et al. Limit analysis versus limit equilibrium for slope stability[J]. Journal of Geotechnical and Geo-environmental Engineering, 1998, 124 : 1 – 11.
|
[5] |
LING H I, LESHCHINSKY D, PERRY E B. Seismic design and performance of geo-synthetic reinforced soil structures [J]. Géotechnique , 1997, 47 (5): 933 – 952.
|
[6] |
MICHALOWSKI R L. Soil reinforcement for seismic design of geotechnical structures[J]. Computers and Geotechnics, 1998, 23 : 1 – 17.
|
[7] |
YANG Xiao-li. Seismic displacement of rock slopes with nonlinear Hoek–Brown failure criterion[J]. International Journal of Rock Mechanics & Mining Sciences, 2007, 44 : 948 – 95.
|
[8] |
MICHALOWSKI R L. Slope stability analysis a kinematical approach[J]. Géotechnique , 1995, 45 (2): 283 – 293.
|
[9] |
JIANG J C, BAKER R, YAMAGAMI T. The effect of strength envelope nonlinearity on slope stability calculations [J]. Can Geotech, 2003, 40 (2): 308 – 25.
|
[10] |
何思明 , 王全才 . 人工高切坡的长期强度指标研究 [J]. 四川大学学报 ( 工程科学版 ), 2005, 37 (6): 26 – 37. (HE Si-ming, WANG Quan-cai. Study on long term strength index of high cut slop[J]. Journal of Sichuan University (Engineering Science Edition), 2005, 37 (6): 26 – 37. (in Chinese) )
|
[11] |
何思明 , 李新坡 . 高切坡半隧道超前支护结构研究 [J]. 岩石力学与工程学报 , 2008, 27 (A02): 3827 – 3832. (HE Si-ming, LI Xin-po. Study on pre-reinforced half-tunnel structure in high cut slope[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (A02): 3827 – 3832. (in Chinese))
|
[12] |
何思明 , 李新坡 , 王成华 . 高切坡超前支护锚杆作用机制研究 [J]. 岩土力学 , 2007, 28 (5): 1050 – 1054. (HE Si-ming, LI Xin-po WANG Cheng-hua. Mechanism on interaction between pre-reinforced anchor bolt and rock mass in high cutting slope[J]. Rock and Soil Mechanics, 2007, 28 (5): 1050 – 1054. (in Chinese) )
|
[13] |
何思明 , 李新坡 . 高切坡超前支护桩作用 机制研究 [J]. 四川大学学报 ( 工程科学版 ), 2008, 40 (3): 43 – 46. (HE Si-ming, LI Xin-po, Study on the interaction between high cutting slope and pre-embedded piles[J]. Journal of Sichuan University (Engineering Science Edition), 2008, 40 (3): 43 – 46. (in Chinese) )
|