• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊

孤岛工作面采前冲击危险性预评估研究

朱广安, 窦林名, 丁自伟, 解嘉豪

朱广安, 窦林名, 丁自伟, 解嘉豪. 孤岛工作面采前冲击危险性预评估研究[J]. 岩土工程学报, 2018, 40(5): 819-827. DOI: 10.11779/CJGE201805006
引用本文: 朱广安, 窦林名, 丁自伟, 解嘉豪. 孤岛工作面采前冲击危险性预评估研究[J]. 岩土工程学报, 2018, 40(5): 819-827. DOI: 10.11779/CJGE201805006
ZHU Guang-an, DOU Lin-ming, DING Zi-wei, XIE Jia-hao. Pre-evaluation for rock burst risks in island longwall panel before mining[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(5): 819-827. DOI: 10.11779/CJGE201805006
Citation: ZHU Guang-an, DOU Lin-ming, DING Zi-wei, XIE Jia-hao. Pre-evaluation for rock burst risks in island longwall panel before mining[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(5): 819-827. DOI: 10.11779/CJGE201805006

孤岛工作面采前冲击危险性预评估研究  English Version

详细信息
    作者简介:

    朱广安(1989- ),男,江苏建湖人,讲师,主要从事冲击矿压、矿山压力、采矿地球物理等方面的研究。E-mail: zhuguangan@163.com。

Pre-evaluation for rock burst risks in island longwall panel before mining

  • 摘要: 为研究开采扰动下孤岛工作面冲击危险性,基于覆岩空间结构理论分析了开采前后两侧采空区顶板结构动态变化和力学响应。首先基于能量力学模型,推导了工作面开采后覆岩演化高度的计算公式。根据两侧采空区顶板结构的不同,将孤岛工作面覆岩结构分为长臂对称“T”结构、短臂对称“T”结构和非对称“T”结构。进而通过理论分析了3种孤岛工作面覆岩结构的应力传递机制,建立了孤岛工作面静载荷、动载荷估算模型,进而提出了工作面支承压力估算方法,并构建了孤岛工作面采前冲击危险预评估体系。采用估算模型及评估方法,对朝阳煤矿3112孤岛工作面进行了冲击危险性评估,为现场实践提供理论依据。
    Abstract: In order to investigate the rock burst risk in an island longwall panel, the dynamic evolution and mechanical response of roof structures over goafs are analyzed based on the theory of spatial structures. First of all, the energy mechanical model is adopted to calculate the height of destressed zone above the mined panel. The spatial structures of overburden above the island panel are classified into three categories based on field observations and speculation: long-arm “T”, short-arm “T” and asymetric “T”. Subsequently, the model for calculating the average static and dynamic stresses is established, and the estimation formulas are derived by analyzing theoretically stress transfer mechanisms. Also, the estimation methods for abutment stress are proposed, and the pre-evaluation system is established for rock burst risks in an island longwall panel before mining. Finally, the proposed model is used to determine the stress distribution of the side abutment of longwall panel 3112 in Chaoyang Coal Mine, and the monitoring of ground subsidence verifies the rationality of this model. The findings obtained in this study provide a theoretical guidance for safe mining in coal mines.
  • [1] 窦林名, 何 烨, 张卫东. 孤岛工作面冲击危险及其控制[J]. 岩石力学与工程学报, 2003, 22(11): 1866-1869. (DOU Lin-ming, HE Ye, ZHANG Wei-dong. Hazards of rock burst in island coal face and its control[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(11): 1866-1869. (in Chinese))
    [2] PENG S S. Topical areas of research needs in ground control: a state of the art review on coal mine ground control[J]. International Journal of Mining Science and Technology, 2015, 25(1): 1-6.
    [3] 曹安业, 朱亮亮, 李付臣, 等. 厚硬岩层下孤岛工作面开采“T”型覆岩结构与动压演化特征[J]. 煤炭学报, 2014, 39(2): 328-335. (CAO An-ye, ZHU Liang-liang, LI Fu-chen, et al. Characteristics of T-type overburden structure and tremor activity in isolated face mining under thick-hard strata[J]. Journal of China Coal Society, 2014, 39(2): 328-335. (in Chinese))
    [4] 杨光宇, 姜福兴, 王存文. 大采深厚表土复杂空间结构孤岛工作面冲击地压防治技术研究[J]. 岩土工程学报, 2014, 36(1): 189-194. (YANG Guang-yu, JIANG Fu-xing, WANG Cun-wen. Prevention and control technology of mine pressure bumping of coal mining face in seam island based on deep mining and thick topsoil of complex spatial structure of overlying strata[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(1): 189-194. (in Chinese))
    [5] JIANG Y D, WANG H W, XUE S, et al. Assessment and mitigation of coal bump risk during extraction of an island longwall panel[J]. International Journal of Coal Geology, 2012, 95(2): 20-33.
    [6] LI Z L, DOU L M, WANG G F, et al. Risk evaluation of rock burst through theory of static and dynamic stresses superposition[J]. Journal of Central South University, 2015, 22(2): 676-683.
    [7] ZHU S T, FENG Y, JIANG F X. Determination of abutment pressure in coal mines with extremely thick alluvium stratum: a typical kind of rockburst mines in China[J]. Rock Mechanics and Rock Engineering, 2015, 49(5): 1-10.
    [8] 李振雷, 窦林名, 王桂峰, 等. 坚硬顶板孤岛煤柱工作面冲击特征及机制分析[J]. 采矿与安全工程学报, 2014, 31(4): 519-524. (LI Zhen-lei, DOU Lin-ming, WANG Gui-feng, et al. Rock burst characteristics and mechanism induced within an island pillar coalface with hard roof[J]. Journal of Mining & Safety Engineering, 2014, 31(4): 519-524. (in Chinese))
    [9] SUCHOWERSKA A M, MERIFIELD R S, CARTER J P. Vertical stress changes in multi-seam mining under supercritical longwall panels[J]. International Journal of Rock Mechanics and Mining Sciences, 2013, 61(7): 306-320.
    [10] 王同旭, 刘传孝, 王小平. 孤岛煤柱侧向支承压力分布的数值模拟与雷达探测研究[J]. 岩石力学与工程学报, 2002, 21(增刊2): 2484-2487. (WANG Tong-xu, LIU Chuan-xiao, WANG Xiao-ping. FLAC3D numerical simulation and radar detection of lateral abutment pressure distribution of isolated coal pillar[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(S2): 2484-2487. (in Chinese))
    [11] 窦林名, 贺 虎. 煤矿覆岩空间结构OX-F-T演化规律研究[J]. 岩石力学与工程学报, 2012, 31(3): 453-460. (DOU Lin-ming, HE Hu. Study of OX-F-T spatial structure evolution of overlying strata in coal mines[J]. Chinese Journal of Rock Meachanics and Engineering, 2012, 31(3): 453-460. (in Chinese))
    [12] DOU L M, MU Z L, LI Z L, et al. Research progress of monitoring, forecasting, and prevention of rockburst in underground coal mining in China[J]. International Journal of Coal Science & Technology, 2014, 1(3): 278-288.
    [13] SALAMON M D G. Energy considerations in rock mechanics: fundamental results[J]. Journal-South African Institute of Mining and Metallurgy, 1984, 84(8): 233-246.
    [14] JAEGER J C, COOK N G W. Fundamentals of Rock Mechanics, third ed[M]. London: Chapman & Hall, 1979: 593.
    [15] YAVUZ H. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines [J]. International Journal of Rock Mechanics and Mining Sciences, 2004, 41(2): 193-205.
    [16] REZAEI M, HASSANI M F, MAIDI A. Determination of longwall mining-induced stress using the strain energy method[J]. Rock Mechanics and Rock Engineering, 2015, 48(6): 2421-2433.
    [17] 钱鸣高, 缪协兴, 许家林. 岩层控制的关键层理论[M]. 徐州: 中国矿业大学出版社, 2003. (QIAN Ming-gao, MIAO Xie-xin, XU Jia-lin. The key stratum in strata movement [M]. Xuzhou: China University of Mining and Technology Press, 2003. (in Chinese))
    [18] 许家林, 钱鸣高. 覆岩关键层位置的判别方法[J]. 中国矿业大学学报, 2000, 29(5): 463-467. (XU Jia-lin, QIAN Ming-gao. Method to distinguish key strata in overburden [J]. Journal of China University of Mining & Technology, 2000, 29(5): 463-467. (in Chinese))
    [19] FENG X J, WANG E Y, SHEN R X, et al. The dynamic impact of rock burst induced by the fracture of the thick and hard key stratum[J]. Procedia Engineering, 2011, 26: 457-465.
    [20] 窦林名, 赵从国, 杨思光, 等. 煤矿开采冲击矿压灾害防治[M]. 徐州: 中国矿业大学出版社, 2006: 4-33. (DOU Lin-ming, ZHAO Cong-Guo, YANG Si-guang, et al. Prevention and control of rock burst in coal mine[M]. Xuzhou: China University of Mining and Technology Press, 2006: 4-23. (in Chinese))
计量
  • 文章访问数:  337
  • HTML全文浏览量:  4
  • PDF下载量:  172
  • 被引次数: 0
出版历程
  • 修回日期:  2017-03-09
  • 发布日期:  2018-05-24

目录

    /

    返回文章
    返回