[1] |
杨 芮, 习志锐, 潘少华. 深基坑支护方案优化及其应力应变分析[J]. 水电能源科学, 2013(12): 143-146. (YANG Rui, XI Zhi-rui, PAN Shao-hua, et al. Scheme optimization and stress -straiin analysis of retaining and protecting for deep foundation excavation[J]. Water Resources and Power, 2013(12): 143-146. (in Chinese))
|
[2] |
冯艳辉, 王武刚, 杨 媛. 预应力锚杆复合土钉墙在云南某基坑工程应用中的改进[J]. 建筑结构, 2013, 24: 72-75. (FENG Yan-hui, WANG Wu-gang, YANG Yuan. Improvement of prestressed anchor and composite soil nailing wall in an foundation pit engineering in Yun nan province[J]. Building Structure, 2013, 24: 72-75. (in Chinese))
|
[3] |
朱逢斌, 缪林昌, 顾欢达, 等. 桩墩扶壁复合土钉墙设计参数的敏感性分析[J]. 工业建筑, 2013, 11: 77-83. (ZHU Feng-bin, MIAO Lin-chang, GU Huan-da, et al. Sensitivity analysis of design parametes of composite wall with bored piles in deep excavation[J]. Industrial Construction, 2013, 11: 77-83. (in Chinese))
|
[4] |
黄雪峰, 马 龙, 陈帅强, 等. 预应力锚杆内力传递分布规律与时空效应[J]. 岩土工程学报, 2014, 42(4): 1165-1172. (HUANG Xue-feng, MA Long, CHEN Shuai-qiang, et al. Distribution characteristics and time-space effect of internal force for prestressed anchor[J]. Chinese Journal of Geotechnical Engineering, 2014, 42(4): 1165-1172. (in Chinese))
|
[5] |
董 诚, 郑颖人, 陈新颖, 等. 深基坑土钉和预应力锚杆复合支护方式的探讨[J]. 岩土力学, 2009, 30(12): 3793-3796+3802. (DONG Cheng, ZHENG Ying-ren, CHEN Xin-ying, et al. Research on composite support pattern of soil nails and prestressed anchors indeep foundation pits[J]. Rock and Soil Mechanics, 2009, 30(12): 3793-3796, 3802. (in Chinese))
|
[6] |
贾金青, 郑卫锋, 陈国周. 预应力锚杆柔性支护技术的数值分析[J]. 岩石力学与工程学报, 2005(21): 180-184. (JIA Jin-qing, ZHENG Wei-feng. Study and application of flexible retaining method with prestressed anchor[J]. Chinese Journal of Geotechnical Engineering, 2005(21): 180-184. (in Chinese))
|