[1] |
李佳川, 夏明耀. 地下连续墙深基坑开挖与纵向地下管线保护[J]. 同济大学学报, 1995, 23(5): 499-506. (LI Jia-chuan, XIA Ming-yao. Protection of longitudinal underground pipe lines during the diaphragm wall deep excavation[J]. Journal of Tongji University, 1995, 23(5): 499-506. (in Chinese))
|
[2] |
李大勇, 龚晓南. 深基坑开挖对周围地下管线影响因素分析[J]. 建筑技术, 2003, 34(2): 94-96. (LI Da-yong, GONG Xiao-nan. Analysis on impact of excavation of deep foundation pits on buried pipelines[J]. Architecture Technology, 2003, 34(2): 94-96. (in Chinese))
|
[3] |
孔祥鹏, 刘国彬, 廖少明. 明珠线二期上海体育馆地铁车站穿越施工对地铁一号线车站的影响[J]. 岩石力学与工程学报, 2004, 23(5): 821-824. (KONG Xiang-peng, LIU Guo-bin, LIAO Shao-ming. Influence of construction of Shanghai stadium transverse station of pearl line phase Ⅱ on station of metro line NO.1[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(5): 821-824. (in Chinese))
|
[4] |
段绍伟, 沈蒲生. 深基坑开挖引起邻近管线破坏分析[J]. 工程力学, 2005, 22(4): 80-83. (DUAN Shao-wei, SHEN Pu-sheng. Analysis of nearby pipeline damage induced by deep excavation[J]. Engineering Mechanics, 2005, 22(4): 80-83. (in Chinese))
|
[5] |
杜金龙, 杨 敏. 深基坑开挖对邻近地埋管线影响分析[J]. 岩石力学与工程学报, 2009, 28(增刊1): 3016-3020. (DU Jin-long, YANG Min. Influence analysis of excavation of deep pit on adjacent buried pipe lines[J]. Chinese Journal of Rock Mechanics and Engineering,2009, 28(S1): 3016-3020. (in Chinese))
|
[6] |
魏 纲, 魏新江, 裘新谷, 等. 过街隧道施工对地下管线影响的三维数值模拟[J]. 岩石力学与工程学报, 2009, 28(增刊1): 2853-2859. (WEI Gang, WEI Xin-jiang, QIU Xin-gu, et al. 3D Numerical simulation of effect of underground urban street-passage tunnel construction on adjacent pipeline[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(S1): 2853-2859. (in Chinese))
|
[7] |
魏 刚. 基坑开挖对下方既有盾构隧道影响的实测与分析[J]. 岩土力学, 2013, 34(5): 1421-1428. (WEI Gang. Measurement and analysis of impact of foundation pit excavation on below existed shield tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 34(5): 1421-1428. (in Chinese))
|
[8] |
郑 刚, 刘庆晨, 邓 旭, 等. 基坑开挖对下卧运营地铁既有箱体影响的实测及分析[J]. 岩土力学, 2012, 33(4): 1109-1117. (ZHENG Gang, LIU Qing-chen, DENG Xiu, et al. Field measurement and analysis of effect of excavation on existing tunnel boxes of underlying metro tunnel in operating [J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 33(4): 1109-1117. (in Chinese))
|
[9] |
郑 刚, 刘庆晨, 邓 旭, 等. 基坑开挖对下卧运营地铁隧道影响的数值分析与变形控制研究[J]. 岩土力学, 2013, 34(5): 1459-1468. (ZHENG Gang, LIU Qing-chen, DENG Xiu. Numerical analysis of effect of excavation on underlying existing metro tunnel and deformation control[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 34(5): 1459-1468. (in Chinese))
|
[10] |
姜兆华, 张永兴, 蔡 宇. 邻近隧道的岩质深基坑开挖影响研究[J]. 岩石力学与工程学报, 2012, 31(增刊2): 3520-3526. (JIANG Zhao-hua, ZHANG Yong-xing, CAI Yu. Influence study of deep rock foundation pit excavation on adjacent tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(S2): 3520-3526. (in Chinese))
|
[11] |
胡 琦, 许四法, 陈仁朋, 等. 深基坑开挖土体扰动及其对邻近地铁隧道的影响分析[J]. 岩土工程学报, 2013, 35(增刊2): 537-541. (HU Qi, XU Si-fa, CHEN Ren-peng, et al. Influence of soil disturbance on metro tunnel in soft clay due to excavation of deep foundation pit[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 537-541. (in Chinese))
|
[12] |
RANDOLPH M F, WORTH C P. Application of the failure state in undrained single shear to shaft capacity of driven piles[J]. Géotechnique, 1981, 31(1): 143-157.
|