• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊

既有高陡挡墙下深基坑开挖支护设计与分析

黄承忠

黄承忠. 既有高陡挡墙下深基坑开挖支护设计与分析[J]. 岩土工程学报, 2014, 36(zk2): 92-98. DOI: 10.11779/CJGE2014S2016
引用本文: 黄承忠. 既有高陡挡墙下深基坑开挖支护设计与分析[J]. 岩土工程学报, 2014, 36(zk2): 92-98. DOI: 10.11779/CJGE2014S2016
HUANG Cheng-zhong. Design and analysis of supports for deep foundation pit under an existing high-steep retaining wall[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 92-98. DOI: 10.11779/CJGE2014S2016
Citation: HUANG Cheng-zhong. Design and analysis of supports for deep foundation pit under an existing high-steep retaining wall[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 92-98. DOI: 10.11779/CJGE2014S2016

既有高陡挡墙下深基坑开挖支护设计与分析  English Version

详细信息
    作者简介:

    黄承忠(1983- ),男,硕士,主要从事岩土工程勘察设计工作。E-mail: 179772035@qq.com。

Design and analysis of supports for deep foundation pit under an existing high-steep retaining wall

  • 摘要: 通过对高度为62 m的既有高陡肋板式锚杆挡墙墙脚开挖15 m的基坑支护设计作为实例,对超限高边坡的特殊性及其在支护设计中存在的问题进行了分析,在此基础之上采用建筑边坡工程技术规范(GB50330— 2002)、数值模拟、工程类比法相结合的方法对支护结构进行了优化设计和效果评价。监测结果表明,本工程支护设计经济有效地保护了既有高陡挡墙及其顶部大型公共建筑的安全,对其它类似工程具有较强的参考意义。
    Abstract: The design of supports for a deep foundation pit with an excavation depth of 15 m under an existing high-steep retaining wall 62 m in height is taken as an example. The specificity of ultra-high slopes and the existing problems in their design of supports are analyzed. Technical code for building slope engineering (GB50330), numerical simulation and engineering analogy method are combined for the design and effect evaluation of the supports. The monitoring results show that the design is effective to protect the high-steep retaining wall and large-scale public buildings. It may be a reference for other similar projects.
  • [1] GB50330 建筑边坡工程技术规范[S]. 2002. (GB50330 Technical code for building slope engineering[S]. 2002. (in Chinese))
    [2] 雷 用, 黄承忠, 邱 洪. 超限岩质高边坡对既有隧洞影响及对策研究[J]. 岩土工程学报, 2012, 32(增刊2): 352-357. (LEI Yong, HUANG Cheng-zhong, QIU Hong. Influence of ultra-high rocky slopes on existing tunnels and countermeasures[J]. Chinese Journal of Geotechnical Engineering, 2012, 32(S2): 352-357. (in Chinese))
    [3] 薛丽影, 杨文生. 某高边坡桩基立柱锚拉式挡土墙设计[J]. 岩土工程学报, 2013, 35(增刊2): 1176-1179. (XUE Li-ying, YANG Wen-sheng. Design of upright-anchored pile retaining wall in a high slope[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 1176-1179. (in Chinese))
    [4] 雷 用, 郝江南, 肖 强. 高边坡设计中的几个问题探讨[J]. 岩土工程学报, 2010, 32(增刊2): 598-602. (LEI Yong, HAO Jiang-nan, XIAO Qiang. Inquiring some problem in high slope design[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S2): 598-602. (in Chinese))
    [5] 刘兴远, 唐秋元, 夏 阳. 建筑边坡工程技术发展展望[J].重庆建筑, 2012, 11(107): 15-18. (LIU Xing-yuan, TANG Qiu-yuan, XIA Yang. Prospect of construction technology for side slope[J]. Chongqing Architecture, 2012, 11(107): 15-18. (in Chinese))
    [6] 雷 用, 赵尚毅. 高盛置业魁星楼C组团基坑支护工程方案设计有限元论证报告[R]. 重庆: 重庆市地质灾害防治工程技术研究中心, 2011. (LEI Yong, ZHAO Shang-yo. The foundation supporting design finite element verification report on Kuxinglou Group C of Gaosheng Home[R]. Chongqing: Geological Disaster Prevention and Treatment of Chongqing Rearch Center, 2011. (in Chinese))
计量
  • 文章访问数: 
  • HTML全文浏览量:  0
  • PDF下载量: 
  • 被引次数: 0
出版历程
  • 收稿日期:  2014-07-27
  • 发布日期:  2014-07-27

目录

    /

    返回文章
    返回